Before you book a Participate Energy prepaid lease estimate, answer five questions: can you pay or borrow the prepayment, will you stay six years or more, are you fine not owning the system until then, do you need an ownership-only rebate, and can the install finish before the end of 2027? If the answers fit, bring your usage and roof details to the appointment, and leave with 10 things in writing, starting with the cash price the prepayment is based on.
The Checklist at a Glance
| Stage | What you do | Why it matters |
|---|---|---|
| 1. Before you book | Run the five-question fit test | A prepaid lease is a poor fit for some households, and no estimate can fix that |
| 2. Before the appointment | Gather 8 items | The prepayment is a share of the system price, so an oversized design costs you upfront |
| 3. At the appointment | Ask for 10 things in writing | Most of the terms that decide your real savings are not on the sales proposal |
| 4. Before you sign | Make 4 California checks | License, consumer guide, cancellation window and timeline protect you if something goes wrong |
New to the product? In short: since January 1, 2026, California homeowners who buy solar no longer get the 30% federal tax credit. Participate owns your system for at least six years, claims the Section 48E business credit instead, and charges you a one-time prepayment of about 70% of the system’s value, with no monthly lease bill for 25 years. For the dollar math, see our sister site’s Participate Energy lease cost breakdown.
Step 1: The Five-Question Fit Test
Answer these honestly before anyone comes to your house. If you get two or more “no” answers, ask for a cash, loan, or standard lease estimate instead, or alongside.
| Question | If yes | If no |
|---|---|---|
| Can you pay the prepayment in cash, or borrow it? | Good fit. On an $18,000 to $24,000 system, that is roughly $12,600 to $16,800. | A standard lease or PPA needs little upfront, usually with a yearly price increase. Compare them in our prepaid lease vs PPA, purchase and loan guide. |
| Will you stay in the home six years or more? | You reach the point where you can buy the system. | A buyer can take over the lease with a transfer notice, but you never reach ownership. |
| Are you fine with Participate owning the system for six years? | No change for you day to day. Participate is responsible for keeping it working. | Buy with cash or a loan so you own it from day one. |
| Can you do without a rebate that requires you to own the system? | No conflict. | Some utility rebates, such as municipal utility programs, are for customer-owned systems only. Price an owned system too. |
| Can the install be finished well before December 31, 2027? | The business credit behind the discount should still apply. | Ask what happens to your price if the project slips past the deadline (more in Step 4). |
One more practical point: Participate does not sell directly. You get a Participate estimate through a partner installer, so the installer’s price and design are what you are really evaluating. Participate also lists separate no-upfront programs, including one for CARE and FERA customers, so if the prepayment is the obstacle, ask whether one of those applies.
Step 2: What to Have Ready Before the Appointment
Because the prepayment is a percentage of the system price, every extra panel the installer adds is paid for upfront. Good inputs keep the design, and the price, honest.
- 12 months of electricity use in kWh, downloaded from your utility account, not just one bill.
- Your current rate plan name (for example, a time-of-use plan). Under California’s net billing rules, exported solar earns far less than it used to, so sizing to your real use matters. Our NEM 3.0 explainer covers why.
- New loads you expect in the next few years: an EV, heat pump, pool, or ADU.
- Your roof’s age and material. Participate will own panels on your roof for years, so ask now who pays to remove and reinstall them if the roof needs work. See solar panels and roof age.
- A photo of your electrical panel label, so any panel upgrade shows up in the estimate instead of as a later change order.
- HOA rules, if you have an HOA. Our guide to solar permits and HOA approval explains what to expect.
- How you would pay the prepayment: cash, savings, or a loan pre-approval from your own bank or credit union, so you can compare it with any loan the installer offers.
- Everyone on the title who will sign, at the appointment or on the call.
Step 3: Get These 10 Things in Writing
A sales proposal shows a prepayment and a savings chart. The terms that decide whether it is a good deal live in the lease agreement and the installation contract. Ask for each of these before you leave the appointment, or in the follow-up email.
| # | Ask for | Why |
|---|---|---|
| 1 | The cash price and the cash price per watt the prepayment is based on | If the base price is padded, 70% of it is padded too. Compare it with at least one ordinary cash estimate for similar equipment. |
| 2 | The same system priced as cash, loan and prepaid lease, side by side | Same panels, battery and production, so the only difference is how you pay. |
| 3 | The prepayment in dollars, and anything else due later | “30% off” is not a number you can compare. Permit fees or a panel upgrade may be billed separately. |
| 4 | How the buyout is calculated and the first date you can use it | Participate’s page says year 6 at fair market value. A Solar.com guide describes the option from the fifth anniversary. EnergySage notes a $0 buyout is not guaranteed. Get your contract’s answer. |
| 5 | Expected annual production, and whether any production guarantee exists | The estimate is a design forecast. One partner installer says the prepaid lease has no production guarantee. |
| 6 | Panel, inverter, and battery models, and whether they qualify for the credit | Foreign-supplier rules can limit which equipment qualifies, which may explain why a brand is chosen. |
| 7 | Who pays for repairs and replacements after each manufacturer warranty ends | Inverters and batteries often carry shorter warranties than the 25-year term. |
| 8 | The target completion date, and what happens to your price if it slips past December 31, 2027 | The discount depends on the business credit and its deadline. |
| 9 | Transfer terms if you sell, including any fee | Participate says a buyer can take over with a notice and no credit check. Confirm the fee in writing. |
| 10 | Insurance requirements for equipment you do not own | Ask whether Participate must be named on your homeowners policy, and check with your agent. |
When the written estimate arrives, our sister site shows how to read a Participate lease quote line by line, including the red flags to watch for.
If you hear “this price is only good today”: the real deadline is the end of 2027 for projects that had not started construction by July 4, 2026, not the end of the appointment. Say: “Please email me the proposal, the lease agreement, and the contract. I will get back to you after I compare.” A good installer will agree.
Step 4: Four California Checks Before You Sign
You will usually sign two documents: an installation contract with the installer and a lease agreement with Participate. Check both.
The installer’s license
Look up the license number on the CSLB site. The CPUC says it should be active and in class C-46 (solar), C-10 (electrical), or B (general building). The salesperson should be registered with CSLB as a home improvement salesperson.
The Solar Consumer Protection Guide
In PG&E, SCE, and SDG&E territory, the installer must collect your signature on the CPUC’s California Solar Consumer Protection Guide as part of the interconnection application. You should get time to read it first. LADWP and other municipal utilities are not covered by that rule, so ask your installer for the guide anyway.
Your cancellation window
The CPUC and CSLB say most homeowners have at least three business days to cancel a home solar contract, and homeowners 65 or older have five. The clock starts when you receive a signed, dated copy. Ask whether the same window applies to the lease agreement.
The timeline in writing
Under the 2025 budget law, solar that did not begin construction by July 4, 2026 must be placed in service by December 31, 2027 for the owner to claim the 48E credit. Make sure the completion target and the “what if it slips” answer from item 8 are in the contract, not just in the conversation.
For the full list of contract checks that apply to any solar estimate, see our general solar estimate checklist.
Frequently Asked Questions
What should I have ready for a Participate Energy lease estimate?
Twelve months of electricity use, your rate plan, any new loads you expect, your roof’s age, a photo of your electrical panel label, HOA rules, and a clear idea of how you would pay the prepayment.
Can I ask for a cash price on a Participate lease estimate?
Yes, and you should. The prepayment is about 70% of the system value your installer sets, so the cash price per watt tells you whether the discount is real.
Does a Participate prepaid lease need a credit check?
Participate says it does not underwrite on credit score and does not require a UCC lien. If you borrow the prepayment, the lender may check credit and file its own lien.
Is there a deadline for a Participate prepaid lease?
No program end date has been announced, but the discount depends on the 48E business credit and its December 31, 2027 placed-in-service deadline for most new solar. Ask what happens to your price if the install slips.
Can I cancel a solar lease after signing in California?
Most homeowners have at least three business days to cancel a home solar contract, and five if they are 65 or older, according to the CPUC and CSLB. Confirm the terms in both documents you sign.
Bring This Checklist to Your Estimate
US Power will price the same system as cash, loan, and participate prepaid lease side by side, and answer all 10 questions in writing. Book your free solar estimate or call (818) 650-8010.
This checklist is general information, not tax, legal, or financial advice. Program terms vary by installer and can change. Read your lease agreement and installation contract, and confirm with a tax or financial professional before you sign.
Sources
Terms, rules, and dates were checked on October 21, 2026.
- Participate Energy, Prepaid Lease
- Participate Energy, programs overview
- EnergySage, Participate Energy Review (June 2026)
- Solar.com, Participate Energy’s Prepaid Lease: A Consumer Guide (September 2026)
- Citadel Roofing and Solar, A new way to go solar after the tax credit ends
- Novogradac, Compliance timeline for Sections 48E and 45Y (June 2026)
- IRS, Residential Clean Energy Credit
- CPUC, California Solar Consumer Protection Guide
- CSLB, Industry Bulletin on solar contracts
- CSLB, What Seniors Should Know Before Hiring a Contractor
- US Power press release, partnership with Participate Energy (July 2026)